We use cookies on different pages to make visits of our website attractive and enable use of certain functions. These are small text files stored on your computer. Most of the cookies we use are deleted again from your hard disk after the end of your browser session (so-called session cookies). Other cookies will remain on your computer and make it possible for us to recognise your computer again at your next visit (so-called permanent cookies). Our partner companies have no right to collect personal information via cookies through our website, to process or use them.
X

EFFICIENT WIND FARMS

RAISE YOUR POTENTIAL

In recent years, the use of wind energy has been greatly developed, making it a significant contribution to power supply worldwide. Its potential for expansion is considered the most economical of all renewable energies. The trenchless installation of the pipes for transporting and distributing the wind energy makes it possible to exploit this great potential in an economically sensible and environmentally friendly manner.

GAIN MORE ENERGY

Whether you generate wind energy on land or at sea: our innovative NODIG systems are suitable for connecting wind power plants onshore and offshore as well as for cabling between individual turbines, or to the power plant. Using flexible techniques, an efficient pipeline network can increase the availability of wind energy with minimum effort. And because the technologies are ecological and emissions are low, the NODIG method can make a valuable contribution to the public acceptance of wind farms technology. A classical win-win situation!

AT A GLANCE

  • Underground installation of pipes for the transport of electricity from offshore and onshore wind farms under traffic and waterways, with short or long pipes made of all standard materials
  • The ability for connecting pipelines to wind power plants/wind turbines, and the distributor for feeding wind energy into the network, can also be installed without trenches
  • Reduced space requirements for the necessary pipeline construction
  • Calculable costs for construction and expansion of the pipeline network
  • Sustainable techniques with high economic efficiency

Connection of wind power plants/wind turbines

Cabling: Wind turbine–Wind turbine

Method:
HDD horizontal directional drilling
Bore length:
Max. 500 m
Pipe diameter:
Up to 710 mm (pipe bundles) for single conductors up to 250 mm
Pipe materials:
PE, steel
Soil classes:
1–7, acc. to DIN 18324
Our suitable NODIG-System for your application:
GRUNDODRILL - FLUID-ASSISTED HDD RIGS
Find out more

Cabling: Land–Offshore wind power plant

Method:
HDD horizontal directional drilling
Bore length:
Max. 500 m
Pipe diameter:
Up to 710 mm (pipe bundles) for single conductors up to 250 mm
Pipe materials:
PE, steel
Soil classes:
1–7, acc. to DIN 18324
Our suitable NODIG-System for your application:
GRUNDODRILL - FLUID-ASSISTED HDD RIGS
Find out more

Cabling: Wind turbine–Distribution station

Method:
HDD horizontal directional drilling
Bore length:
Max. 500 m
Pipe diameter:
Up to 710 mm (pipe bundles) for single conductors up to 250 mm
Pipe materials:
PE, steel
Soil classes:
1–7, acc. to DIN 18324
Our suitable NODIG-System for your application:
GRUNDODRILL - FLUID-ASSISTED HDD RIGS
Find out more

DO YOU HAVE ANY QUESTIONS?

WE WILL BE GLAD TO HELP YOU!

YOU CAN REACH US
BY PHONE FROM
MONDAY TO FRIDAY
07:00 TO 17.00 O'CLOCK!

CALL US!

SEND US A MESSAGE
AND WE WILL GET BACK
TO YOU!

WRITE TO US!
Contact

Do you have any product or
services related questions?

Please contact us:

+49 2723 808-0

SEND E-MAIL